Customer Service: +61 3 8470 7300
  • Homepage
  •  Projects

Projects

Displaying 1 - 8 of 131 Projects

End of Line
CSP Pacific’s Armorwire Wire Rope Barrier separates cars from kids
Jul 2019

CSP Pacific’s Armorwire Wire Rope Barrier separates cars from kids

A long, straight 80km/h road, QEII Drive (SH74) in Christchurch had virtually no barriers to ensure the safety of pedestrians and drivers until earlier this ...

more
CSP Pacific’s Steel Multiplate - a fish friendly option for the Waikato Expressway
Jul 2019

CSP Pacific’s Steel Multiplate - a fish friendly option for the Waikato Expressway

What is 75m long, 5m wide and has 13,000 bolts? A Steel Multiplate culvert from CSP Pacific, installed by the City Edge Alliance who are responsible for the ...

more
TraFix Water Cable Barrier a superior option to cones
Jul 2019

TraFix Water Cable Barrier a superior option to cones

The ever-increasing demand for housing in Auckland continues to see new housing subdivisions pop up around the city’s fringes. And with new residential ...

more
Telecommunication towers to support connectivity for rural NZ
May 2019

Telecommunication towers to support connectivity for rural NZ

With a small population and a relatively large landmass, connecting the whole of New Zealand - an absolute necessity in this modern age - is not an easy task ...

more
Proof in the pudding - Multiplate Arch - a good option for seismic zones
May 2019

Proof in the pudding - Multiplate Arch - a good option for seismic zones

The 7.8 magnitude earthquake that struck Kaikoura in November 2016 - one of the most complex quakes in New Zealand’s recorded history due to more than 20 ...

more
Nu-Guard® - warehouse pedestrian safety at Winstone Wallboards
May 2019

Nu-Guard® - warehouse pedestrian safety at Winstone Wallboards

While CSP Pacific’s range of road barrier products are doing their job across the country to keep people safe on New Zealand’s roads, there has ...

more
Super•Cor® Arch – fast, easy and cost effective
May 2019

Super•Cor® Arch – fast, easy and cost effective

Construction of New Zealand’s first Super•Cor® Arch first began in 2014. Simon de Rose, Contracts Manager for Stringfellows, says, “three ...

more
Newly installed Armorwire saves lives on Hawke’s Bay Expressway
Dec 2018

Newly installed Armorwire saves lives on Hawke’s Bay Expressway

One of the first elements of the Hawke’s Bay Expressway improvements, a roundabout at the intersection of SH50 and Links Road, was completed in early ...

more
DocLaunch Page Launch Commonon Launch