Customer Service: +61 3 8470 7300
  • Homepage
  •  News

News

Displaying 43 - 48 of 105 News Items

End of Line

Keeping up with the play

Keeping up with the play

30 April 2018: “Attendance at this huge event in March – an important part in my induction into the industry - was an eye opener for me,” says Gemma.  “Not only is it the world’s leading trade event for the traffic and ...

more >>

Wire Rope Safety Barriers from CSP Pacific – the right barrier for the road

Wire Rope Safety Barriers from CSP Pacific – the right barrier for the road

30 April 2018: Flexible wire rope road safety barrier systems, also known as wire rope barriers (WRB), are being increasingly specified in median and side of road installations across the country by the NZ Transport Agency and Councils as evidence continues to ...

more >>

Nu-Guard® 31 Guardrail Systems – Reminder re post height change

Nu-Guard® 31 Guardrail Systems – Reminder re post height change

28 February 2018: In December CSP Pacific advised of a change in the height of the Nu-Guard® 31 post with the top of the post now located 10mm ...

more >>

Clarification of pull/push test for Nu-Guard® 31

Clarification of pull/push test for Nu-Guard® 31

28 February 2018: For Nu-Guard® 31 Guardrail Systems to perform as intended, and remain at the correct height, they must be installed in soil conditions that have sufficient strength to support the posts as required.

more >>

A message from Gemma April

A message from Gemma April

31 December 2017: As a relatively small but agile organisation CSP Pacific has been involved in projects throughout New Zealand and the South Pacific for the last four decades which, at their heart, intend to help keep people safe - through the provision of barrier, ...

more >>

Are barriers causing issues with underground services? CSP Pacific have the solution

Are barriers causing issues with underground services? CSP Pacific have the solution

22 December 2017: Most barrier systems including guardrail, wire rope and terminal ends involve the use of a post driven into the ground. Where there are underground services located in the vicinity of the barrier installation, the use of driven posts can cause ...

more >>

Our sites

Auckland
304 Neilson St
Onehunga
Auckland 1061

Christchurch
8 Gallagher Drive
Hornby South

LATEST PROJECTS

New Portable Solar Lights show the way

5 June 2020: Construction for Phase 1 of Watercare’s Northern Interceptor project, which will redirect ...

more >>

Steel Multi-plate™ culvert the first and best choice for 500+ home subdivision

5 June 2020: An 84.5ha rural site on the western side of the Grand Drive motorway exit in Orewa’s West is ...

more >>

NEW HV2 BARRIER – out and about in Auckland

1 March 2020: Anyone living in Auckland right now will agree that there’s an awful lot of change going on ...

more >>
DocLaunch Page Launch Commonon Launch