Customer Service: +61 3 8470 7300
  • Homepage
  •  News

News

Displaying 61 - 66 of 105 News Items

End of Line

Office open day a success for the Christchurch team

Office open day a success for the Christchurch team

21 November 2016: After the recent opening of the new premises for CSP Pacific in the South Island, the team decided it was time to hold an open day to meet customers and give them the opportunity to see the product range first hand.

more >>

High-risk, rural roads get serious attention from Safe Roads and Roadsides programme

High-risk, rural roads get serious attention from Safe Roads and Roadsides programme

31 October 2016: One of the NZ Transport Agency’s mandates is to offer a safer roading network for New Zealand motorists. However, with the death toll on our roads considered to still be far too high, a more concentrated effort was required to reduce the death ...

more >>

CSP Pacific Hire team goes through a reshuffle

CSP Pacific Hire team goes through a reshuffle

31 October 2016: With a staff departure from the CSP Pacific Hire team in Auckland, the business has made a few changes, including two internal promotions. “I am happy to introduce Anthony Upoko as CSP Pacific’s North Island Hire Manager,” says ...

more >>

NEW: Nu-Guard® 31 – Reduced distance from Batter Hinge Point

NEW: Nu-Guard® 31 – Reduced distance from Batter Hinge Point

31 October 2016: Most barrier systems require at least 600mm from the back of the barrier to the batter hinge point (BHP) of a slope to perform as designed and tested. If a barrier had to be closer to this point usually the embedment depth of the post would be ...

more >>

Technical Talk - Wire Rope Safety Barrier Transitions

Technical Talk - Wire Rope Safety Barrier Transitions

29 August 2016: In November 2014 the New Zealand Transport Agency published Technical Memorandum  TM-2013 on wire rope safety barrier (WRSB) transitions.

more >>

CSP Pacific Christchurch moves to larger premises

CSP Pacific Christchurch moves to larger premises

29 August 2016: At the beginning of August, after 20 years of cohabitating with other Fletcher Building businesses, CSP Pacific has moved to their own, more spacious and comfortable surroundings.

more >>

Our sites

Auckland
304 Neilson St
Onehunga
Auckland 1061

Christchurch
8 Gallagher Drive
Hornby South

LATEST PROJECTS

New Portable Solar Lights show the way

5 June 2020: Construction for Phase 1 of Watercare’s Northern Interceptor project, which will redirect ...

more >>

Steel Multi-plate™ culvert the first and best choice for 500+ home subdivision

5 June 2020: An 84.5ha rural site on the western side of the Grand Drive motorway exit in Orewa’s West is ...

more >>

NEW HV2 BARRIER – out and about in Auckland

1 March 2020: Anyone living in Auckland right now will agree that there’s an awful lot of change going on ...

more >>
DocLaunch Page Launch Commonon Launch