    CSP announces its MASH (2016) compliant wire rope barrier system - Sentryline – M® Wire Rope Barrier

CSP announces its MASH (2016) compliant wire rope barrier system - Sentryline – M® Wire Rope Barrier

Send to printer
End of Line

We are very pleased to introduce a new and exciting MASH approved product to our barrier product range. The Sentryline – M® Rope Barrier System, developed and tested right here in New Zealand.

Sentryline – M® Wire Rope Barrier System

Designed in New Zealand  by  CSP®, supported by a Fletcher Building Innovation grant, the Sentryline – M® Wire Rope Barrier System has been tested to MASH (2016) TL-3 and TL-4 by Holmes Solutions. Our new Sentryline – M® Wire Rope Barrier System is a high-tension cable barrier and terminal end that has many advantages over other cable barrier systems currently available.

Features:

  • Tested to MASH (2016) TL-3 and TL-4 by Holmes Solutions
  • Approved by the Austroads Safety Barrier Assessment Panel (ASBAP)
  • Accepted by Waka Kotahi (NZ Transport Agency) for use on the New Zealand state highway roading network
  • Exceptionally good vehicle control
  • Can be installed in median or road side applications
  • Easily installed with minimal maintenance required
  • Quick to repair after a collision
  • Features non-releasing terminal ends
  • Alternative foundation design options available
  • Designed in New Zealand

“Our team has been working for a long period of time to bring this new system, proudly developed and tested here in New Zealand, to the market place and we look forward to presenting it to all of our customers,” says Neil Watson, Head of CSP®. “The development of this system places CSP® in a small group of MASH (2016) WRBS system owners globally. We are excited to see some major installations of the new system in New Zealand and Australia shortly, and further afield in the near future.”

For more on Sentryline – M® Wire Rope Barrier >

For more on Sentryline – M® Wire Rope Terminal End >

 

Our sites

Auckland
304 Neilson St
Onehunga
Auckland 1061

Christchurch
8 Gallagher Drive
Hornby South

LATEST PROJECTS

New Portable Solar Lights show the way

5 June 2020: Construction for Phase 1 of Watercare’s Northern Interceptor project, which will redirect ...

more >>

Steel Multi-plate™ culvert the first and best choice for 500+ home subdivision

5 June 2020: An 84.5ha rural site on the western side of the Grand Drive motorway exit in Orewa’s West is ...

more >>
DocLaunch Page Launch Commonon Launch