Customer Service: +61 3 8470 7300
  • Homepage
  •  Projects

Projects

Displaying 105 - 112 of 125 Projects

End of Line
Specially designed columns mean Wi Fi for Glen Innes children
Dec 2010

Specially designed columns mean Wi Fi for Glen Innes children

Every so often a project comes along that gives everyone a good feeling. Auckland Transport, with help from Vector, has funded the installation of twenty ...

more
Hire barriers a key to safety on SH20 – 1 project
Dec 2010

Hire barriers a key to safety on SH20 – 1 project

In the past Wiri Station Road in Manukau City has been the only link to SH20. A new 4.8km motorway now connects SH20 at its existing end at the Puhinui ...

more
CSP Pacific’s Streetlight Columns provide the finishing touches to Eden Park
Dec 2010

CSP Pacific’s Streetlight Columns provide the finishing touches to Eden Park

With Eden Park all but complete and with the ground’s capabilities recently tested during its first major fixture – the Kiwis vs. Kangaroos on 6 ...

more
Tiwai Road bridge gets a second life
Oct 2010

Tiwai Road bridge gets a second life

The Tiwai Road bridge, built in 1969 and the only access for employees and maintenance services to the New Zealand Aluminium Smelter (NZAS), has been upgraded ...

more
Clean lines required for Newmarket viaduct
Oct 2010

Clean lines required for Newmarket viaduct

At the heart of the four-year Newmarket Connection Project is a four-stage replacement of the Newmarket viaduct motorway flyover, with a wider, stronger, more ...

more
CSP Pacific’s Universal TAU-II™ makes a difficult location safe
Aug 2010

CSP Pacific’s Universal TAU-II™ makes a difficult location safe

A retro upgrade and replacement of a crash cushion just north of Johnsonville on SH1 called for the installation of CSP Pacific's Universal ...

more
Oclyte™ columns support wind sculpture
Jun 2010

Oclyte™ columns support wind sculpture

Ten years and $750,000 later, Wellington's Meridian wind sculpture series is finally complete. Phil Dadson's “Akau Tangi” has been ...

more
Engineering challenges on Southern Motorway
Jun 2010

Engineering challenges on Southern Motorway

Two streetlight columns that flanked the overbridge at Takanini on Auckland’s Southern Motorway were past due for replacement when CSP Pacific’s ...

more
DocLaunch Page Launch Commonon Launch