Customer Service: +61 3 8470 7300
  • Homepage
  •  Projects

Projects : Armorwire Wire Rope Barrier Systems

Displaying 1 - 8 of 9 Projects

End of Line
Newly installed safety improvements on SH3 prove their worth
Jun 2018

Newly installed safety improvements on SH3 prove their worth

Safety improvements on SH3 between Ohaupo and Te Awamutu last year have proved their worth.

more
CSP Pacific’s products out in force on Rangiriri
Aug 2017

CSP Pacific’s products out in force on Rangiriri

Slowly the pieces to the puzzle that is the Waikato Expressway are coming together as new sections of the 102km project from Bombay to south Cambridge are ...

more
Armorwire Wire Rope Barrier – safety with good looks
Apr 2016

Armorwire Wire Rope Barrier – safety with good looks

Marine Parade’s iconic row of Norfolk pines in Napier were first planted in the 1890’s and have been the subject of controversy over the years - ...

more
CSP Pacific supplies the finishing touches to Lyttelton Tunnel project
Aug 2014

CSP Pacific supplies the finishing touches to Lyttelton Tunnel project

On 31 August the New Zealand Transport Agency (NZTA) will celebrate the 50th anniversary of the Lyttelton Tunnel’s construction and the opening of the ...

more
Ngaruawahia ‘whole of life cost’ a factor when selecting Armorwire
Feb 2014

Ngaruawahia ‘whole of life cost’ a factor when selecting Armorwire

The completion of the Ngaruawahia Bypass section of the Waikato Expressway has seen the inclusion of CSP Pacific’s Armorwire Wire Rope Barrier system for ...

more
Armorwire a good looking choice
Aug 2013

Armorwire a good looking choice

When looking at the safety upgrade planned for a stretch of road on SH2 at Whirinaki just north of Napier, the New Zealand Transport Agency (NZTA) considered ...

more
Armorwire - barrier of choice
Aug 2012

Armorwire - barrier of choice

Bulls Gorge on SH10 in Northland has been the site of many accidents over the years with police frequently requesting that motorists drive defensively when ...

more
Armorwire put to the test on killer road
Dec 2011

Armorwire put to the test on killer road

A 3.4 km stretch CSP Pacific’s Armorwire Median TL-4 Cable Barrier System installed as part of a multimillion-dollar overhaul of a killer stretch of ...

more
DocLaunch Page Launch Commonon Launch