Customer Service: +61 3 8470 7300
  • Homepage
  •  New 

    NEW: Nu-Guard® 31 – Reduced distance from Batter Hinge Point

NEW: Nu-Guard® 31 – Reduced distance from Batter Hinge Point

Send to printer
End of Line

Most barrier systems require at least 600mm from the back of the barrier to the batter hinge point (BHP) of a slope to perform as designed and tested. If a barrier had to be closer to this point usually the embedment depth of the post would be extended to compensate for the reduction in soil support on the post.

Nu-Guard® 31 testing of post in relation to BHP
Nu-Guard® 31 post extracted after testing

 As the Nu-Guard® 31 post yields at ground level rather than rotating in the soil (as with traditional guardrail posts), CSP Pacific undertook testing at Opus Research analysing the performance of the post in varying locations away from the BHP to determine if the 600mm could be reduced.

As a result of this testing, CSP Pacific is pleased to announce that the Nu-Guard® 31 steel guardrail system can now be installed as little as 200mm from the BHP, therefore maximising the available road width when installing the barrier.

Please note that to install the Nu-Guard® 31 system up to 200mm from the BHP the soil conditions must be compliant to both of the following NZ Transport Agency specifications:

  • TNZ B/2 - Construction of unbound granular pavement layers
  • TNZ M/4 - Basecourse aggregate

Where the posts are installed in weak soil conditions a minimum of 600mm of soil between the post and the BHP still applies.

For more information about Nu-Guard® 31 Steel Post Guardrail, click here or
Email: cspcustomerservice@csppacific.co.nz or
Phone CSP Pacific on 0800 655 200

Locations

NZ Regional Map

Auckland, Northland and Central Nth Island

Ph: +64 9 634 1239

Fx: +64 9 634 4525

more info

LATEST PROJECTS

ArmorZone™ TL-2 Plastic Barriers out in force for Baypark to Bayfair upgrade

31 October 2018: Tauranga is a city on the move, literally and figuratively, claiming the title as the ...

more >>

M2PP – Miles of life-saving barrier

26 August 2018: The 18km, four-lane Mackays to Peka Peka Expressway that takes SH1 along the Kāpiti Coast is the ...

more >>
DocLaunch Page Launch Commonon Launch
Auckland Lower Nth Island South Island