Advancing Road Safety and Construction

Telarc Website
 
Projects
 
 
 
 
Displaying 1 - 5 of 9 Projects. View Product Information
Steel Multiplate - out of shape, but not out of action
(Aug 2017) The 7.8 magnitude earthquake that struck Kaikoura in November 2016 - one of the most complicated quakes in New Zealand’s recorded history thanks to more than 20 fault ruptures - resulted in widespread damage to property, ...
more >
View Project
 
 
 
CSP Pacific’s Steel Multiplate – fast, efficient and a friend to the environment
(Feb 2017) The Karaka Lakes and the Karaka Harbourside residential developments on the Hingaia Peninsula in South Auckland have been extremely popular, with new homebuyers flocking to the area. To keep up with demand more land is being ...
more >
View Project
 
 
 
NEW - Multiplate cattle troughs - the ideal solution for large South Island farm
(Feb 2015) Due to its diverse geography, Lees Valley Station - just inland from the Canterbury Plains - is home to a range of livestock enterprises including a sheep herd numbering close to 20,000, 1,000 beef cows, 600 ...
more >
View Project
 
 
 
Everybody is happy including the fish
(Feb 2013) For the property developer of a site at the end of Blacks Road in Greenhithe to have access to the whole of his site, with the intention of creating 40 residential sections, the installation of a ...
more >
View Project
 
 
 
CSP Pacific’s Multiplate eliminates road and rail closures at Waipukurau Overpass project
(Nov 2012) A 90m long Multiplate arch, manufactured by CSP Pacific, has been installed on SH2, 2kms north of Waipukurau over a live rail line. The new overpass replaces a two-lane bridge built in 1937. The old ...
more >
View Project
 
 
 
 1  2  Next
 

Mouseover map to find locations

 
News
> New positions for two well-known faces
more >
> A message from Gemma:
more >
> Corrugated Metal Culverts – Durability in New Zealand Conditions
more >
View all News Releases >
 
Auckland Central Nth Island Lower Nth Island Sth Island