CSP Pacific does its bit for the Christchurch rebuild
Following the Christchurch earthquakes, a 200m section of Fitzgerald Ave’s northbound lane came precariously close to sliding into the adjacent picturesque Avon river as a result of major subsidence.  The Stronger Christchurch Infrastructure Rebuild Team (SCIRT) ...
more >
View Project
 
 
 
CSP Pacific supply complete package for Ruby Bay Bypass
The new 10.7km bypass on SH60 NZTA’s $30 million Ruby Bay Bypass project was completed in October last year, considerably earlier than scheduled. The new 10.7km ...
more >
View Project
 
 
 
Tiwai Road bridge gets a second life
A section of the south west approach showing the completed guardrail and X-350 terminal end treatment  The Tiwai Road bridge, built in 1969 and the only ...
more >
View Project
 
 
 
Steel barrier protects people and plant at Coke
  Coca-Cola Amatil New Zealand had invested around $80 million dollars on a state of the art (36,000 pallet position) storage and distribution centre in Mt Wellington and were only 2 months from the scheduled opening of ...
more >
View Project
 
 
 
Dunedin Southern Motorway Safety Improvements
    Safety improvements have recently been carried out on Dunedin's Southern Motorway between Lookout Point and Green Island in response to the road’s crash history.  Additional guardrail has been installed on both sides of the carriageway to increase ...
more >
View Project
 
 
 
 

Mouseover map to find locations

 
News
> NEW - Bolt Down X-350 End Terminal
more >
> Rail on Curve and Curved Rail Anchorage
more >
> NEW - NZTA M23 Specification Interim Appendix B: Bridge Barrier Systems
more >
View all News Releases >
 
Northland Auckland Central Nth Island Lower Nth Island Upper Sth Island Lower Sth Island