Advancing Road Safety and Construction

Telarc Website
 
Projects
 
 
 
 
Displaying 76 - 80 of 160 Projects.
Custom built barrier by CSP Pacific
(Jun 2014) Work is almost complete on two replacement bridges on the Waitaki River on SH82 at Kurow, North Otago.  The new bridges will replace two wooden, 132 year-old single lane bridges (256m and 140m long) which have ...
more >
View Project
 
 
 
The complete package
(Jun 2014) The new $220 million Hobsonville motorway in northwest Auckland was opened in August - six months ahead of schedule. The elegant, sweeping motorway is a six kilometre long, four lane motorway between Upper Harbour Bridge in ...
more >
View Project
 
 
 
Swamp Road Multiplate – Record time for manufacture and installation
(Apr 2014) A hole in the road surface on Swamp Road in Hawkes Bay was just the beginning of a much larger issue for the Hastings District Council (HDC) when they discovered it was due to the failure ...
more >
View Project
 
 
 
CSP Pacific’s expertise called on for repair of bridge
(Apr 2014) In May 2013 a small truck travelling west towards Havelock North struck the concrete barrier of the Maraetotara Bridge, breaching the railings and coming to rest on the river-bed below, seriously injuring the driver. This left ...
more >
View Project
 
 
 
Ngaruawahia ‘whole of life cost’ a factor when selecting Armorwire
(Feb 2014) The completion of the Ngaruawahia Bypass section of the Waikato Expressway has seen the inclusion of CSP Pacific’s Armorwire Wire Rope Barrier system for both the median and side-of-road safety solution. The 12.3 km section of ...
more >
View Project
 
 
 
Prev  4  5  6  7  8  9  10  11  12  13  14  15   16  17  18  19  20  21  22  23  24  25  26  27  28  29  Next
 

Mouseover map to find locations

 
News
> Wire Rope Safety Barriers from CSP Pacific – the right barrier for the road
more >
> Keeping up with the play
more >
> A message from Gemma:
more >
View all News Releases >
 
Auckland Central Nth Island Lower Nth Island Sth Island