Advancing Road Safety and Construction

Telarc Website
 
News Releases
 
 
 
 
Displaying 25 - 30 of 86 News Releases.
 
Technical Talk – Updated TAN on Wire Rope Safety Barrier post footings
The NZ Transport Agency has updated their Technical Advice Note (TAN), TAN #16-01 (released in February 2016) (Published on Website: 20 December 2016)
more >
 
 
 
Road safety barrier accreditation scheme is all go!
The NZ Transport Agency has announced in a Technical Advice Note (TAN #16-17) that, together with Australian road controlling... (Published on Website: 20 December 2016)
more >
 
 
 
Office open day a success for the Christchurch team
After the recent opening of the new premises for CSP Pacific in the South Island, the team decided it was time to hold an open ... (Published on Website: 21 November 2016)
more >
 
 
 
High-risk, rural roads get serious attention from Safe Roads and Roadsides programme
One of the NZ Transport Agency’s mandates is to offer a safer roading network for New Zealand motorists. However, with the ... (Published on Website: 31 October 2016)
more >
 
 
 
CSP Pacific Hire team goes through a reshuffle
With a staff departure from the CSP Pacific Hire team in Auckland, the business has made a few changes, including two internal... (Published on Website: 31 October 2016)
more >
 
 
 
NEW: Nu-Guard® 31 – Reduced distance from Batter Hinge Point
Most barrier systems require at least 600mm from the back of the barrier to the batter hinge point (BHP) of a slope to perform ... (Published on Website: 31 October 2016)
more >
 
 
 
 
Prev  1  2  3  4   5  6  7  8  9  10  11  12  13  14  15  Next
 
Auckland Central Nth Island Lower Nth Island Sth Island