| |
| Welcome to Road Rave |
February 2011 |
|
| |
| CSP Pacific’s thoughts and sympathies are with all the people of Canterbury affected by the devastating earthquake on Tuesday 22 February. We wish you all the best for a very trying and difficult time ahead. |
| |
To unsubscribe click here
In this issue:
- X-350 Fully Re-directive Terminal End : one product to cover all situations, more >
- CSP Pacific supplies complete package for Ruby Bay Bypass, more >
- Oclyte Tuff Coat™ the best choice for high risk columns, more >
- The versatility of Nu-Guard™ Steel Guardrail on SH1 at Pukerua Bay, more >
- ArmorZone™ - New name for TL-2 Water Filled Plastic Barrier, more >
|
X-350 Fully Re-directive Terminal End : one product to cover all situations
A terminal end to suit any situation, CSP Pacifc’s X-350 Fully Re-directive Terminal End can be used in Median, Tangent or Flared installations up to 1200mm. The X-350 is the world’s first fully re-directive guardrail terminal end and is designed and manufactured in New Zealand, making it the only home grown terminal on the market.
View news item >
For more information about X-350 Fully Re-directive Terminal End click here or
Email: cspcustomerservice@csppacific.co.nz or
Phone: 0800 655 200 |
 |
CSP Pacific supplies complete package for Ruby Bay Bypass
NZTA’s $30 million Ruby Bay Bypass project was completed in October last year, considerably earlier than scheduled. The new 10.7km bypass on SH60 is a more direct route between Motueka and Nelson and realigns SH60 inland away from the Mapua/Ruby Bay townships, resolving the issues caused by the road having multiple speed limits. The new highway improves efficiency and is safer and more reliable – and features a variety of products from CSP Pacific.
View case study >
For more information about Armorwire Cable Barrier System click here >
For more information about X-350 Fully Re-directive Terminal End click here
For more information about Oclyte™ Streetlight Columns click here
For more information about Flexrail™ W-Beam Guardrail click here or
Email: cspcustomerservice@csppacific.co.nz or
Phone: 0800 655 200
|
 |
Oclyte Tuff Coat™ the best choice for high risk columns
Oclyte Tuff Coat™, with its 20-year warranty, is proving to be a firm choice by authorities for lighting projects where there is a high risk to the columns. Both Palmerston North City and Tauranga City Council have specified that all columns installed in their region will be given the added protection of the coating.
View case study >
For more information about Oclyte Tuff Coat™ click here or
Email: cspcustomerservice@csppacific.co.nz or
Phone: 0800 655 200
|
 |
Nu-Guard™ 31 Steel Guardrail performs dual function
A section of SH1 near Pukerua Bay, Wellington has recently been upgraded with CSP Pacific’s Nu-Guard™ 31 Steel Guardrail system which performs the dual function of road barrier and pedestrian barricade.
View case study >
For more information about Nu-Guard™ 31 Steel Guard Rail system click here or
Email: cspcustomerservice@csppacific.co.nz or
Phone: 0800 655 200 |
 |
ArmorZone™ : TL-2 Water Filled Plastic Barrier
“To help distinguish between various barriers we have renamed the TL-2 Plastic Water Filled Barrier to ArmorZone™ which should make the barrier easier to identify for our customers,” said Sue Walker, Marketing and Export Manager for CSP Pacific.
ArmorZone™ is a TL-2 crash tested barrier made up of plastic units that, when joined together using a steel pin and filled with water, provides positive work zone barrier protection to temporary construction sites and other roadside activities. When ArmorZone™ is impacted with 820kg or 2,000kg vehicles at speeds of 70kph and angles up to 25 degrees, the impacting vehicle is stopped, re-directed or contained in a safe manner.
For more information about ArmorZone™ click here or
Email: cspcustomerservice@csppacific.co.nz or
Phone: 0800 655 200 |
|
|